Project
19B Hamilton Rd

19B Hamilton Rd

Courtyard elevation. Spot, cut, and repointed all failed mortar joints to the minimum depth of ¾ of an inch. Replaced all the failed and cracked concrete bricks, then we pressure washed the entire courtyard elevation to prepare for a waterproof coating. After letting the masonry to dry for two days two coats of Sika 550W...

Project
65 Comm Ave

65 Comm Ave

The west side of the building on Clarendon St. required a complete cutting and repointing of all mortar join, ¾ inch deep. The cast stone details were repaired and/or replaced with high strength mortar and concrete mix, and coated with Matrix RT. We refinished all wooden window trims and sashes, replaced the glazing around the...

Project
79 Pleasant St.

79 Pleasant St.

Boston Masonry performed a complete cut and repoint of the brick masonry façade with a minimum depth of ¾ of an inch. We then repaired and/or replaced all failed caste stone details, sills, and lintels. All the perimeter sealants around the windows were replaced with Dymonic sealant.  We prepped primed and repainted all wooden window...